WHECO re-powered to Tier III compliance, and performed service life extensions, on six Link-Belt Rough terrain cranes. The project was designed to cost effectively extend the economic service life of these cranes. A replacement cost analysis lead the New York-based rental company to hire WHECO to perform the work.