WHECO Projects
This blog page has some of our recent repair and restoration work showing progress throughout the project and the final result. Every project has an interesting story to tell with unique engineering, metalurgical, and logistical problems to solve. From structural repair to complete restoration or a Service Life Extension Project (SLEP), WHECO delivers.
- Email WHECO
info@wheco.com - Phone WHECO
512-633-7413 - Subscribe to this
WHECO Blog
Projects: Terminator 3 Crane Repair – Demag AC395
Crane almost misses starring role in Terminator 3 “machines” movie!
The crane was heavily damaged on set of Terminator 3 before filming was complete. According to International Cranes and Transport Magazine, the crane sustained damage during a practice run. While the driver was not injured the crane required major repairs after being flipped and rolled.
Projects: Malcolm Drilling BG18 Mast Repair
WHECO Repairs Bauer BG18 Mast for Malcolm Drilling
It’s nice to know we are teamed up with a great supplier like WHECO that can tackle complex mechanical repair projects in a professional and expeditious manner. Your help on this project is appreciated.
Projects: PROJECTS: Complete Turn-Key Repair of Demag AC180 All-Terrain Crane
Demag AC180 turn-key repair by WHECO
This accident damaged Demag AC180 all-terrain crane was repaired at WHECO’s Aiken, SC facility. The extensive repairs included frame and superstructure work, complete electrical rework, structural repairs to the hydraulic boom, and repairs to the telescopic cylinder. Repairs completed by WHECO carry a warranty that—in many cases—surpasses commercial standards and/or the original manufacturer’s specifications.
Projects: Manitowoc 2250 Repaired in Andes
A Manitowoc 2250 suffered multiple broken teeth on the swing bearing and swing pinion. The crane was located at approximately 10,000 feet in the Andes Mountains outside of Santiago, Chile. With a demanding production schedule, replacement of the bearing and pinion was not a practical solution. WHECO was called upon to provide a safe, time and cost effective structural repair. Two… Read More
Projects: Demag Crawler Crane Turn-Key Repair
WHECO performed a series of challenging structural repairs to put this Demag crawler crane back into revenue generating service. In addition to repairing/restoring 180′ of main boom and 120′ of jib, the superstructure was severly damaged requiring extensive repairs. All structual, mechanical, hydraulic, electric and electronic repairs were performed using two of WHECO’s five facilities to expidite… Read More